whatsapp: 0086-18615575385
whatsapp: 0086-13668821631

Activated Sludge Process Didactic Equipment Vocational Training Equipment Process Control Trainer

Item No.: CE 705
Activated Sludge Process Didactic Equipment Vocational Training Equipment Process Control Trainer
Description
CE 705 Activated Sludge Process Didactic Equipment Vocational Training Equipment Process Control Trainer

Wastewater treatment plant in laboratory scale: aerobic biological degradation of organic substances, system control via PLC
Features
- aerobic biological degradation of organic substances
- nitrification and pre-denitrification
- device control using an integrated PLC
- integrated router for operation and control via an end device and for screen mirroring on additional end devices: PC, tablet, smartphone
Learning objectives/experiments
- learning the fundamental principle of the activated sludge process
- functional principle of nitrification and pre-denitrification
- creation of a stable operating state
- identification of the following influencing factors
-- return sludge ratio
-- reflux ratio of the internal recirculation
-- sludge age
-- sludge loading
-- volumetric loading
-- oxygen concentration and temperature
- efficiency of the pre-denitrification
- screen mirroring: mirroring of the user interface on end devices
-- menu navigation independent of the user interface shown on the touch screen
-- different user levels available on the end device: for observing the experiments or for operation and control
Specification
[1] aeration tank divided into two areas
[2] secondary clarifier with sludge scraper
[3] nitrification and pre-denitrification
[4] separate supply unit with 2 stirring machines
[5] control and measurement of temperature, oxygen concentration and flow rate
[6] measurement of pH value in the aeration tank
[7] ectromagnetic flow rate sensors
[8] device control with PLC via touch screen
[9] integrated router for operation and control via an end device and for screen mirroring: mirroring of the user interface on up to 5 end devices
[10] data acquisition via PLC on internal memory, access to stored measured values via WLAN with integrated router/ LAN connection to customer's own network


Technical data
PLC: Eaton XV-303
Tanks
- aeration tank (nitrification zone): approx. 34L
- aeration tank (denitrification zone): approx. 17L
- secondary clarifier: 30L
- raw water tank: 200L
- treated water tank: 80L
Flow rates
- raw water pump: max. 34L/h
- return sludge pump: max. 34L/h
- circulation pump: max. 34L/h
Speeds (stirring machines)
- raw water tank: each max. 600min-1
- aeration tank: each max. 330min-1
- secondary clarifier: max. 45min-1
Measuring ranges
- flow rate:
-- 0,6...30L/h (raw water and return sludge)
-- 3...60L/h (internal recirculation)
-- 50...550L/h (compressed air)
- temperature: 0...50°C
- pH value: 0...14
- oxygen concentration: 0...20mg/L
230V, 50Hz, 1 phase
230V, 60Hz, 1 phase; 120V, 60Hz, 1 phase
UL/CSA optional
LxWxH: 1550x790x1150mm (supply unit)
LxWxH: 2830x790x1900mm (trainer)
Total weight: approx. 450kg